The spiral model
prototyping with the controlled and systematic aspects of the waterfall model,
therein providing the potential for rapid development of incremental versions of
the software. In this model the software is developed in a series of incremental
releases with the early stages being either paper models or prototypes.
iterations become increasingly more complete versions of the product.
, the model is divided into a number of task regions.
Depending on the model it may have 3-6 task regions (/framework
activities) our case will consider a ‘6-task region’ model.
These regions are:
1. The customer communication task – to establish effective communicationbetween developer and customer.
2. The planning task – to define resources, time lines and other project
related information..
3. The risk analysis task – to assess both technical and management risks.
4. The engineering task – to build one or more representations of the
application.
5. The construction and release task – to construct, test, install and provide
user support (e.g., documentation and training).
6. The customer evaluation task – to obtain customer feedback based on the
evaluation of the software representation created during the engineering
stage and implemented during the install stage.
The evolutionary process begins at the centre position and moves in a clockwise
direction. Each traversal of the spiral typically results in a deliverable. For
example, the first and second spiral traversals may result in the production of a
product specification and a prototype, respectively. Subsequent traversals may
then produce more sophisticated versions of the software.
An important distinction between the spiral model and other software models is
the explicit consideration of risk. There are no fixed phases such as specification
or design phases in the model and it encompasses other process models. For
example, prototyping may be used in one spiral to resolve requirement
uncertainties and hence reduce risks. This may then be followed by a
conventional waterfall development.
- Note that each passage through the planning stage results in an adjustment
feedback from the customer, project manager may adjust the number of
iterations required to complete the software….)
- Each of the regions is populated by a set of work tasks called a task set that
projects the number of tasks and their formality is low. Conversely, for large
projects the reverse is true.
Advantages
• The spiral model is a realistic approach to the development of large-scale
software products because the software evolves as the process progresses.
In addition, the developer and the client better understand and react to risks
at each evolutionary level.
• The model uses prototyping as a risk reduction mechanism and allows for
the development of prototypes at any stage of the evolutionary
development.
• It maintains a systematic stepwise approach, like the classic life cycle
model, but incorporates it into an iterative framework that more reflect the
real world.
• If employed correctly, this model should reduce risks before they become
problematic, as consideration of technical risks are considered at all stages.
Disadvantages:
- Demands considerable risk-assessment expertise
- It has not been employed as much proven models (e.g. the WF model) and
involved) that this model is controllable and efficient. [More study needs to
be done in this regard
Hello,
ReplyDeleteThe Article on basic in Spiral Model in Software Testing , gives detailed information about it. Thanks for Sharing the information about advantages and disadvantages on Spiral Model For More information check the detail on the Spiral Model testing here Software Testing Company